Journal · 25 November 2026

Why our sofas take six weeks

Because they are not made until you order one. Here is what happens in those six weeks.

When you order a made-to-order sofa, nothing exists yet. This is what the six to eight weeks are for.

Week 1: the fabric and the frame

Your fabric is cut from the roll – the same dye lot for every piece of your order. In Meda, the frame parts are cut from kiln-dried beech on a CNC machine. That is the only part a machine does.

Weeks 2–4: by hand

The frame is glued and dowelled, the elastic webbing stretched across the seat, the foam shaped and wrapped in feather. The covers are cut and sewn, the cushions filled. Your account shows “Frame built”, then “Upholstered”.

Week 5: quality check in Meda

Every seam, every zip, every foot. Then the sofa is wrapped and joins the weekly groupage to the UK.

Weeks 6–8: at our UK hub, then your room

You choose the day and AM or PM. Two people carry it in, assemble it, and take the packaging away.

If you need a sofa next week, some configurations are in UK stock: the product page says so, configuration by configuration.